Tuesday, August 17, 2010
cool small wheel bikes (non-foldable)
though they are mostly 20" (wheel size), but comes with big front gear and small one at the back so they are pretty fast to ride even on long distance....P
Saturday, August 14, 2010
stEphiE goes to punggol park
Sunday, August 8, 2010
Sunday, August 1, 2010
Looking for YY buns day :)
Rode from Bishan to Purvis Street for the yummy kaya buns and kopi… Tried the Kallang Park connectors on the way back and I got really angry! It was like a mixed-terrain hike rather than a park ride! Didn't had time to take pix of some of the dangerous portions… was trying to keep up with the angmoh who was such a pro and didn't had much of a problem with the "mixed'terrain"
The sky poured buckets day!
Sunday, July 25, 2010
24.07.2010 BBQ
Friday, July 23, 2010
Midnight Ride: From Holland to Jurong.
Total Distance: 16.23km
Distance covered: Ghim Moh to Jurong West Extension: Ulu Pandan Park Connector( Ghim Moh North Buona Vista Road- Ghim Moh Estates - Dover MRT Station - Holland Groove Estates - Sunset Estates - International Business Park - IMM Shopping Mall) - Jurong Park Connector (Chinese Garden MRT-Lakesidse MRT-Yuan Qing Secondary School- Jurong Central Park (opps Jurong Point))-Pioneer Seconday School .
+: a) Cool breezy ride along canal from Ghim Moh to Sunset Estates. b) Flat road, good for leisure cyclist. c) Well lighted PCN (credit to NP, but still no tree falling please). d) No good makan place for supper, less distraction. (if you really need, you can turn to Boon Lay way food centre, your I-already-cycled-so-I-can-eat-supper's Nasi Lemak awaits u)
-: a) Abandon railway track needs repair, be extra careful when carrying the bike across, there's a big lobang at the middle of the track. b) Need to carry bike across an overhead bridge at Junction just before Chinese Garden c) Bicycle track along Yuan Qing Secondary School blocked by construction work at the end of the track making it a dead-end, no signage at the start of the road. (It’s a choice of U turn back and ride by the MRT track or carried our bike across the construction site. We chose the later.) d) Lastly, believe it or not, NO eye-candy, sadly.
SLY
Subscribe to:
Posts (Atom)